«

»

Apr 19

Print this Post

Farfalle To Do List

April 19, 2017

Automotive
-Install brake lights/reverse lights/turn signals/wiring
-Create channel for wiring
-Change oil and filter
Check for leak (Fixed)
-Order and install gas filler neck
-Order and install mud flaps
-Order tubing for and build bumper
-Paint muffler??
-Fix all gas lines (from disconnected tank)
-Find bucket seats
-Torque suspension bolts

Structural
-Finish wheel wells (sheet metal)
-Build sub carriage storage compartment
-Build sub carriage for generator
-Recessed tie-downs in bed
-Cut out the back window
-Install plywood floor
-Build a plywood “box” with back door for moving truck
-Build a ramp for the back of truck

Design
-Side supports/railings for main floor
-Cuddle cubby over the cab
-Top floor seating
-Top floor railing
-Main floor couches including storage
-Back steps
-Artwork….multi-media articulating kaleidoscopic butterflies!

Permanent link to this article: http://farfallegustose.com/wp/farfalle-to-do-list/

Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>